blog

Gray’s Station Bridge Enters River, Construction Continues

The pedestrian bridge construction is continuing to move forward on the south side of Gray’s Station and to the north of Gray’s Lake. Weather depending, the next step for Hubbell and Jensen Construction is to set structures in place to begin on the pier’s and prepare to bring in the physical bridge.

While Hubbell is an expert in many fields, bridge building wasn’t at the top of our list. That’s why we brought in the Jensen Construction Company, the oldest operating business line of The Rasmussen Group. Since 1912, the company has focused on bridge building, heavy construction and marine contracts.

Ryan Cheeseman, with Jensen Construction Company, gives us an inside look on what his team has done so far and what the future schedule looks like for the bridge.